1/2015 – 11/2015
Tätigkeitsbeschreibung
Day to day supervision for subcontractors
Daily telco
Wtg energisation
Substation commissioning
Daily progress report
Projektleitung / Teamleitung (IT)
9/2014 – 12/2014
Tätigkeitsbeschreibung
Day to Day meeting for Termination works
Team leading termination works
Daily Progress Reporting
Service Management
8/2014 – 8/2014
Tätigkeitsbeschreibung
- Representantive (responsible for the Test and Jointing Team)
- Laying of Cablesystems ( Monitoring with OTDR )
- OTDR Testing (UQJ Joints )
We laid a pipeline system (Minisub cable SA cable) on which we installed a fiber optic cable on the top.
The job included 3 x Universal Quick Joints and OTDR tests for each of them. The complete system has been tested by a final acceptance for distance.
During this job I was responsible for all tests and the monitoring of the UQJ installation. I had to report the customer daily about all activities during the work period. We worked 3 weeks in 12 hour shifts.
Projektleitung / Teamleitung (IT), Testen
4/2014 – 7/2014
Tätigkeitsbeschreibung
- Representantive (responsible for the Test and Jointing Team)
- Laying of a Cablesystem
- Powermeter and OTDR Testing
- UQJ Joints
- Documentations
- Monitoring
We laid a pipeline system (Minisub cable DA cable).
The job included 6 x Universal Quick Joints and OTDR tests for each of them. The complete system has been tested by power meter test.
During this job I was responsible for all tests and the monitoring of the cable laying and UQJ installation as a teamleader of the Jointing team. I had to report the customer daily about all activities during the work period. We worked 5 months in 12 hour shifts.
Projektleitung / Teamleitung (IT), Testen
3/2014 – 3/2014
Tätigkeitsbeschreibung
- Offhore Jointer
- Cable and LWL Jointing
- OTDR Testing
- Fiber splicing
- Work Reports
We had to splice electrical cables during the production
phase in the factory of Aker Solutions and afterwards rebuilt the outer cable coat of a 10mm² copper cable.
For the splicing itself I had to prepare the copper core and the coating for the splicing process. After that I had to connect the central elements and joint the copper conductors as per our internal splicing procedure. The connection of the copper cores was done with a restoration of core insulation. After this step the restoration of the outer sheath has been finalized.
During this job I was responsible for the copper splicing. We worked 3 weeks in 12 hour shifts.
Testen
11/2013 – 1/2014
Tätigkeitsbeschreibung
- Cable Jointer
- Cable repair in the factory
We had to splice electrical cables during the production
phase in the factory of Aker Solutions and afterwards rebuilt the outer cable coat of a 25mm² copper cable.
For the splicing itself I had to prepare the copper core and the coating for the splicing process. After that I had to connect the central elements and joint the copper conductors as per our internal splicing procedure. The connection of the copper cores was done with a restoration of core insulation. After this step the restoration of the outer sheath has been finalized.
During this job I was responsible for the copper splicing. We worked 3 months in 12 hour shifts.
Reporting, Testen
4/2010 – 11/2013
Tätigkeitsbeschreibung
- Offshore Jointer
- Laying of a Cablesystem
- OTDR testing
- Isolation testing
- Hang-Off Installation
- Power Cable Installation
We laid cable system (Power Cable cable) for an offshore
wind farm about 80 turbines.
The job included cable pull- in’s, installation of hang-offs, building of fiber sleeves and preparing the cable with plug connections.
The complete system has been tested by final insulation tests and OTDR tests.
During this job I was responsible for all installations and tests as an offshore jointer as well as team leader. Switching authority for a HV test was also a part of my job. I had to report the customer daily about all activities during the work period. We travelled to the platforms via Helicopter and/or with crew boats and worked in 12 hour shifts.
Testen
5/2008 – 10/2014
Tätigkeitsbeschreibung
Cable jointing and testing
Project implementation
Service Management
Zertifikate
Ausbildung
Nordenham
Über mich
My experience includes:
- MV/LV terminations
- Powermeter / OTDR / Isolation testing
- Fiber optic splicing
- preparing customer required documentation (daily Report, test reports, other required documentation)
All these activites were performed by myself (offshore jointer) and also as a Team leader (Supervisor).
Weitere Kenntnisse
CABLE PUllS
CABLE
CLIENT REP
ISOLATION TEST
TEAMLEADER
Persönliche Daten
- Englisch (Gut)
- Deutsch (Muttersprache)
- Europäische Union
- Vereinigte Staaten von Amerika
Kontaktdaten
Nur registrierte PREMIUM-Mitglieder von freelance.de können Kontaktdaten einsehen.
Jetzt Mitglied werden