freiberufler Client Rep / Commissioning and Installation Lead/ Submarine cables auf freelance.de

Client Rep / Commissioning and Installation Lead/ Submarine cables

offline
  • auf Anfrage
  • 26954 Nordenham
  • Weltweit
  • de  |  en
  • 13.11.2015

Kurzvorstellung

Strong management skills and familiar with any commissioning and installation works for example wtg energisation or cable laying

Qualifikationen

  • Installation / Montage / Wartung (allg.)
  • Testen4 J.

Projekt‐ & Berufserfahrung

Client Representative and Commissioning Engineer
Amrumbank West Eon, North Sea
1/2015 – 11/2015 (11 Monate)
Dienstleistungsbranche
Tätigkeitszeitraum

1/2015 – 11/2015

Tätigkeitsbeschreibung

Day to day supervision for subcontractors
Daily telco
Wtg energisation
Substation commissioning
Daily progress report

Eingesetzte Qualifikationen

Projektleitung / Teamleitung (IT)

Installation Lead for Termination works
Baltic 2 Offshore Windfarm, Baltic Sea
9/2014 – 12/2014 (4 Monate)
Dienstleistungsbranche
Tätigkeitszeitraum

9/2014 – 12/2014

Tätigkeitsbeschreibung

Day to Day meeting for Termination works
Team leading termination works
Daily Progress Reporting

Eingesetzte Qualifikationen

Service Management

Teamleader and Representantive
Technip, Trondheim
8/2014 – 8/2014 (1 Monat)
Öl- und Gasindustrie
Tätigkeitszeitraum

8/2014 – 8/2014

Tätigkeitsbeschreibung

- Representantive (responsible for the Test and Jointing Team)

- Laying of Cablesystems ( Monitoring with OTDR )

- OTDR Testing (UQJ Joints )

We laid a pipeline system (Minisub cable SA cable) on which we installed a fiber optic cable on the top.
The job included 3 x Universal Quick Joints and OTDR tests for each of them. The complete system has been tested by a final acceptance for distance.
During this job I was responsible for all tests and the monitoring of the UQJ installation. I had to report the customer daily about all activities during the work period. We worked 3 weeks in 12 hour shifts.

Eingesetzte Qualifikationen

Projektleitung / Teamleitung (IT), Testen

Teamleader / Cable Jointer / Representantive
Staitoil, Sandnessjoen
4/2014 – 7/2014 (4 Monate)
Öl- und Gasindustrie
Tätigkeitszeitraum

4/2014 – 7/2014

Tätigkeitsbeschreibung

- Representantive (responsible for the Test and Jointing Team)

- Laying of a Cablesystem

- Powermeter and OTDR Testing

- UQJ Joints

- Documentations

- Monitoring

We laid a pipeline system (Minisub cable DA cable).
The job included 6 x Universal Quick Joints and OTDR tests for each of them. The complete system has been tested by power meter test.
During this job I was responsible for all tests and the monitoring of the cable laying and UQJ installation as a teamleader of the Jointing team. I had to report the customer daily about all activities during the work period. We worked 5 months in 12 hour shifts.

Eingesetzte Qualifikationen

Projektleitung / Teamleitung (IT), Testen

Cable Jointer
AKER SOLUTIONS NORWAY, Moss
3/2014 – 3/2014 (1 Monat)
Telekommunikation
Tätigkeitszeitraum

3/2014 – 3/2014

Tätigkeitsbeschreibung

- Offhore Jointer

- Cable and LWL Jointing

- OTDR Testing

- Fiber splicing

- Work Reports


We had to splice electrical cables during the production
phase in the factory of Aker Solutions and afterwards rebuilt the outer cable coat of a 10mm² copper cable.
For the splicing itself I had to prepare the copper core and the coating for the splicing process. After that I had to connect the central elements and joint the copper conductors as per our internal splicing procedure. The connection of the copper cores was done with a restoration of core insulation. After this step the restoration of the outer sheath has been finalized.
During this job I was responsible for the copper splicing. We worked 3 weeks in 12 hour shifts.

Eingesetzte Qualifikationen

Testen

Cable Jointer
Aker Solutions mobile, Alabama, mobile
11/2013 – 1/2014 (3 Monate)
Telekommunikation
Tätigkeitszeitraum

11/2013 – 1/2014

Tätigkeitsbeschreibung

- Cable Jointer

- Cable repair in the factory

We had to splice electrical cables during the production
phase in the factory of Aker Solutions and afterwards rebuilt the outer cable coat of a 25mm² copper cable.
For the splicing itself I had to prepare the copper core and the coating for the splicing process. After that I had to connect the central elements and joint the copper conductors as per our internal splicing procedure. The connection of the copper cores was done with a restoration of core insulation. After this step the restoration of the outer sheath has been finalized.
During this job I was responsible for the copper splicing. We worked 3 months in 12 hour shifts.

Eingesetzte Qualifikationen

Reporting, Testen

Cable Jointer
BARD OFFSHORE, North Sea
4/2010 – 11/2013 (3 Jahre, 8 Monate)
Versorgungswirtschaft
Tätigkeitszeitraum

4/2010 – 11/2013

Tätigkeitsbeschreibung

- Offshore Jointer

- Laying of a Cablesystem

- OTDR testing

- Isolation testing

- Hang-Off Installation

- Power Cable Installation

We laid cable system (Power Cable cable) for an offshore
wind farm about 80 turbines.
The job included cable pull- in’s, installation of hang-offs, building of fiber sleeves and preparing the cable with plug connections.
The complete system has been tested by final insulation tests and OTDR tests.
During this job I was responsible for all installations and tests as an offshore jointer as well as team leader. Switching authority for a HV test was also a part of my job. I had to report the customer daily about all activities during the work period. We travelled to the platforms via Helicopter and/or with crew boats and worked in 12 hour shifts.

Eingesetzte Qualifikationen

Testen

Cable Jointer
Nordeutsche Seekabelwerke, Worldwide
5/2008 – 10/2014 (6 Jahre, 6 Monate)
Dienstleistungsbranche
Tätigkeitszeitraum

5/2008 – 10/2014

Tätigkeitsbeschreibung

Cable jointing and testing
Project implementation

Eingesetzte Qualifikationen

Service Management

Zertifikate

Helicopter firefighting
2015
Helicopter landing officer
2015
DANISH MEDICAL CERTIFICATE
2014
G25 G35 G41
2014
BOSIT incl. HUET and ebs
2014
Briefing PPE against falls from heights
2014
Switching authorisation 36kv
2014
Electronic instructed Person
2013
FIRST AID
2013
GWO Working at Heights
2013
Medical Certificate of Fitness for Offshore Work
2013
Medical Zertificate for Service at SEA
2013
Cable istallation System 36 KV
2013
fork-lift truck licence
2013
Pfisterer Plugs System 36 KV
2012

Ausbildung

Electrican
Ausbildung

Nordenham

Über mich

My experience based on offshore-projects for which I had to work with electrical MV/LV Systems.

My experience includes:

- MV/LV terminations
- Powermeter / OTDR / Isolation testing
- Fiber optic splicing
- preparing customer required documentation (daily Report, test reports, other required documentation)

All these activites were performed by myself (offshore jointer) and also as a Team leader (Supervisor).

Weitere Kenntnisse

OTDR TESTING
CABLE PUllS
CABLE
CLIENT REP
ISOLATION TEST
TEAMLEADER

Persönliche Daten

Sprache
  • Englisch (Gut)
  • Deutsch (Muttersprache)
Reisebereitschaft
Weltweit
Arbeitserlaubnis
  • Europäische Union
  • Vereinigte Staaten von Amerika
Profilaufrufe
1641
Alter
35
Berufserfahrung
14 Jahre und 10 Monate (seit 01/2010)
Projektleitung
3 Jahre

Kontaktdaten

Nur registrierte PREMIUM-Mitglieder von freelance.de können Kontaktdaten einsehen.

Jetzt Mitglied werden