A. M. - SPS programmierer und Automatisierungstechniker - Geschäftsführer bei AMART Automation d.o.o.
- Verfügbarkeit einsehen
- 0 Referenzen
- auf Anfrage
- 10410 Velika Gorica
- Europa
- hr | en | de
- 05.07.2024
Kurzvorstellung
Siemens TIA Portal(V14-V17), Step7 Classic, Allen Bradley Studio 5000.
WinCC Pro, Classic and Unified, Factory Talk View
PLC and HMI programming.
Understanding of EPLAN and Pneumatic shematics
Qualifikationen
Projekt‐ & Berufserfahrung
12/2020 – 3/2021
Tätigkeitsbeschreibung
Kuhlerventil assembly line
PLC and HMI programming and Commissioning in the House
Design of Function block for control of pneumatic Festo rotary tables
- Design of Function block for Leakage test device (Festo proportional valve VEAB regulation)
- Design of HMI visualisation and faceplates for new devices
- Commissioning of the line and test production ( IO checkout, manual mode, automatic mode)
PLC: Siemens CPU1517-3PN/DP
HMI:TP900 Comfort panel
Eplan, Inbetriebnahme (allg.), Totally integrated automation portal (TIA portal)
6/2020 – 8/2020
Tätigkeitsbeschreibung
Liquid heater assembly line automation
PLC and HMI programming and Commissioning in the House
Commissioning of the line and test production (IO checkout, manual mode, automatic mode)
PLC: Siemens Siemens CPU 1517F-3PN/DP
HMI: Mobile Panel KTP900F
Inbetriebnahme (allg.), Totally integrated automation portal (TIA portal)
3/2020 – 5/2020
Tätigkeitsbeschreibung
Gearbox assembly line
PLC and HMI programming and Commissioning in the House
Commissioning of the line: ( IO checkout, manual mode)
PLC: AB 1769 Compact Logix
HMI: Panel View Plus 7 10”
Allen Bradley, Inbetriebnahme (allg.)
7/2019 – 11/2019
Tätigkeitsbeschreibung
AC device housing and control buttons assembly line
PLC and HMI programming and Commissioning in the House.
Commissioning of the line and test production in the house (IO checkout , manual mode,automatic mode)
- Commissioning of the Soma greasing system injection
- Commissioning of the Sensopart Vision Camera system (Barcode scanners and object
detection)
PLC: Siemens CPU 315-2PN/DP
HMI: KTP600 Basic
Eplan, Inbetriebnahme (allg.), STEP 7
5/2019 – 12/2019
Tätigkeitsbeschreibung
PLC and HMI programming and Commissioning in the House and at Customer site
Commissioning of the steering wheel control buttons assembly line and test production in the
house (IO checkout , manual mode, automatic mode)
Commissioning of the line at the customer site in Brasov, Romania (November-December
2019)
Commissioning of the Sensopart Vision Camera system (Barcode scanners and object detection)
PLC: Siemens CPU 317-2 PN/DP
HMI:TP900 Comfort Panel
Eplan, Inbetriebnahme (allg.), STEP 7, Totally integrated automation portal (TIA portal)
5/2018 – 4/2019
Tätigkeitsbeschreibung
Offline and online PLC programming.
Commissioning of the line and test production ( IO checkout, manual mode, automatic mode)
Commissioning of the Keyence barcode detection devices
Design and implementation of function block for control of Keyence barcode detection device
PLC:Siemens CPU1515F-2PN
HMI: TP1900 Comfort PRO
Eplan, Inbetriebnahme (allg.), Totally integrated automation portal (TIA portal)
1/2018 – 3/2018
Tätigkeitsbeschreibung
Production support during Commissioning of the Rapid acceleration sensor assembly line at
Customer site
PLC: 1756 Guard Logix 5570 Safety Controller
HMI: Panel View Plus 7 9”
Allen Bradley, FactoryTalkView (Rockwell Automation), Inbetriebnahme (allg.)
8/2017 – 12/2017
Tätigkeitsbeschreibung
Offline and online programming of PLC
Commissioning of the Differential assembly line and test production (IO checkout, manual mode,
automatic mode)
PLC: Siemens CPU 319-3PN/DP
HMI:TP900 Comfort panel
Inbetriebnahme (allg.), STEP 7, Totally integrated automation portal (TIA portal)
5/2017 – 6/2017
Tätigkeitsbeschreibung
Commissioning and implementation of the Mash filter vacuum pump and production support (IO
checkout, manual mode, automatic mode)
PLC: Siemens CPU 414-3DP
SCADA: WinCC
STEP 7, SCADA
2/2017 – 5/2017
Tätigkeitsbeschreibung
Offline PLC programming in Office.
Programming of sequences for Brewhouse units.
PLC: Siemens CPU 416-3PN/DP
SCADA: WinCC
STEP 7, SCADA
1/2017 – 2/2017
Tätigkeitsbeschreibung
Offline and online PLC programming in Office and at the Customer site
Commissioning and the implementation of the new Wort Cooler’s regulation. Production support.
New PID controller implemented. New cleaning of pipes procedure implemented. (IO checkout,
manual mode, automatic mode)
Communicaton with partner PLC via DP-DP Coupler
PLC: Siemens CPU 319-3PN/DP
SCADA: WinCC
Inbetriebnahme (allg.), STEP 7
9/2016 – 12/2016
Tätigkeitsbeschreibung
Brewhouse upgrade of Meura's existing line.
Offline PLC programming in Office.
Programming and testing (simulation) of Brewhouse plant’s unit
PLC: CPU 414-3DP
SCADA: Iltis
STEP 7
7/2016 – 8/2016
Tätigkeitsbeschreibung
Raw material handling Silos automation.
Offline and online PLC programming.(Offline programming in office December 2015-April 2016.)
IO checkout.Manual mode.
PLC: Siemens CPU 414-3PN/DP
SCADA: WinCC
Inbetriebnahme (allg.), STEP 7, SCADA
5/2016 – 6/2016
Tätigkeitsbeschreibung
Brewhouse plant upgrade of the current production line.
Offline and online PLC programming.(Offline programming October-November 2015)
IO checkout.Manual mode and automatic mode.
Commissioning of the line at the customer.
Production support.
PLC: Siemens CPU 414-3PN/DP
SCADA: WinCC
Inbetriebnahme (allg.), STEP 7, SCADA
3/2016 – 4/2016
Tätigkeitsbeschreibung
Brewhouse automation
Offline and online PLC programing of the Brewhouse plant.
IO checkout.Manual mode and automatic mode.
Commissioning of the line and production support.
Siemens CPU 414-3PN/DP
SCADA:WinCC
Inbetriebnahme (allg.), STEP 7, SCADA
3/2015 – 9/2015
Tätigkeitsbeschreibung
Green Leaf Trashing Line Automation
Offline and online PLC programming of the hole line.
IO checkout.Manual mode and automatic mode.
Commissioning at the customer
Inbetriebnahme (allg.), STEP 7, SCADA
9/2014 – 12/2014
Tätigkeitsbeschreibung
Tobacoo primary production line automation
Offline and online PLC programming of sequences.
Commissioning of the Tobacco primary production line at the Customer.
IO checkout and manual mode
Support during production.
PLC: Siemens CPU 416-2DP
SCADA: WinCC
Inbetriebnahme (allg.), STEP 7, SCADA
Ausbildung
Zagreb
Weitere Kenntnisse
Persönliche Daten
- Kroatisch (Muttersprache)
- Englisch (Fließend)
- Deutsch (Grundkenntnisse)
- Europäische Union
- Schweiz
Kontaktdaten
Nur registrierte PREMIUM-Mitglieder von freelance.de können Kontaktdaten einsehen.
Jetzt Mitglied werden